What we require

Tom – We need a short description for the 9 below projects. The description should includes the following…

  • Type of scaffold (i.e. Single/Double, three side, temporary roof covering, etc…)
  • Location
  • Construction time
  • Any special features / challenges with the project

Project 01

   

Project 02

           

Project 03

    

Project 04

      

Project 05

     

Project 06

 

Project 07

     

Project 08

     

Project 09